Electrolux EXS12HC2WI Bedienungsanleitung Seite 14

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 16
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 13
13
Perform the electric safe check after completing installation:
1. Insulated resistance
The insulated resistance must be more than 2M .
2. Grounding work
After finishing grounding work, measure the grounding resistance by visual detection and
grounding resistance tester. Make sure the grounding resistance is less than 4
3. Electrical leakage check (performing during test running)
During test operation after finishing installation, the serviceman can use the electroprobe
and multimeter to perform the electrical leakage check. Turn off the unit immediately if
leakage happens. Check and find out the solution ways till the unit operate properly.
.
Electrical safety check
ELECTRICAL SAFETY AND GAS LEAK CHECK
5. After the evacuation is complete, fully close
manifold valve and stop the
operation of the vacuum pump.
Make evacuation for 15 minutes or more
compound meter indicates
-76cmHg (-1x10 Pa).
6. Turn the stem of the packed valve B about 45
counterclockwise for 6~7 seconds after the gas
coming out, then tighten the flare nut again. Make
sure the pressure display in the pressure indicator
is a little higher than the atmosphere pressure.
7. Remove the charge hose from the Low pressure charge hose.
8. Fully open the packed valve stems B and A.
9. Securely tighten the cap of the packed valve.
the
handle Lo of the
and
check that the
o
Manifold valve
Compound meter
-76cmHg
Handle Lo
Handle Hi
Charge hose
Charge hose
Vacuum pump
Pressure gauge
Low pressure valve
Fig.24
5
When Using the Vacuum Pump
(For method of using a manifold valve, refer to its operation manual.)
1. Completely tighten the flare nuts, A, B, C, D, valve charge
hose to a charge port of the low-pressure valve on the gas pipe side.
2. Connect the charge hose connection to the vacuum pump.
3. Fully open the handle Lo of the manifold valve.
4. Operate the vacuum pump to evacuate. After slightly loose the
flare nut of the Lo valve on the gas pipe side check that the air is entering
(Operation noise pump changes and a com meter indicates
0 instead of minus)
connect the manifold
starting evacuation,
and
of the vacuum pound
Air purging
Seitenansicht 13
1 2 ... 9 10 11 12 13 14 15 16

Kommentare zu diesen Handbüchern

Keine Kommentare